Sep
17
Step 2-install shock absorber and rear swing arm
September 17, 2008 | Leave a Comment
We adjusted the front shock to the stiff setting because it is suitable for most riders. Then we had to drill into the bolt holes in order to make them bigger. Then we debured the holes. The manual asks for nylock nuts but the kit doesn’t come with them so we had to go and [...]
Sep
17
Step 1-Paint
September 17, 2008 | Leave a Comment
t took us about 3 days to apply primer on the frame. It took about the same for the red paint. In all it was about a week. We applied two coats of primer and applied about six coats of red paint.
Sep
16
The BugE
September 16, 2008 | Leave a Comment
When the BugE was delivered it arrived in about a 500 pound box. After we opened the box the BugE was in, it looked like the alien from Alien vs. Predator. Once we unpacked the BugE, it was seperated into the chasis, frame, and electrical equipment.