Mar
2
Speeding up again.
March 2, 2007 | |
Construction on the deck has been moving rather slowly lately. We had a lot trouble figuring out how to hold the skirt attach strips to the foam while the epoxy hardened. After attaching a few pieces of the skirt attach strip, our group decided to get a start on cutting out a hole in the deck for the lift duct to rest in. This step was much easier than any of us would have thought. This was definately a turning point from our slow pace.